Parapet Concrete Flat Roof Detail

The plain parapet wall is nothing but a vertical extension of the wall at the edge of the roof.
Parapet concrete flat roof detail. Concrete flat roof 12 1 background most roofs in singapore are constructed. Trada and approved document part a give guidance on sizes of joists for flat roofs relating to spans and loading. However careful supervision and control during application is needed particularly in ensuring proper curing of concrete consistent thickness and uniform. The construction of the flat roof is similar to that of the timber upper floor.
It dealt in detail with flat roof constructions and can be regarded as one of the first guidelines for such roofs fig. It is a general type of parapet which is specially provided for safety concern. Semi flexible easy to apply detail maintain and repair. Flat roofs of this type are usually finished in steel roof sheet and fall towards a special type of gutter called a box gutter.
If an in situ concrete parapet is built instead of a kerb this. Concrete coping is provided at top and corbel below it. Banding is typically used to seal soil vent pipes on single ply roofs such as fdt rhepanol pib and involves wrapping an unreinforced membrane around the pipe to a minimum height of 150mm an approved sealant is then applied to the top of the membrane. Nov 30 2014 explore alex radford foster s board parapet detail on pinterest.
The perimeter of the roof assembly insulation is wrapped to prevent interstitial airflow from the parapet into the multilayered rigid insulation of the field of the roof. Concrete subfloor on 3 4 base over 30 lb. Parapet wall so that the edge of the bitumen. Felt or vapor barrier j j joists bear on.
Unlike most industry standard roof canales made of wood and sheet metal which deteriorate rapidly in a few short years our fiberspan concrete canales roof scuppers endure the most extreme of weather conditions for many years. What typical detailing methods are used to seal flat roof penetrations. Typical methods include banding pitch pockets and cover flashings. The cure for parapetitus is continuity of the control layers and letting things move when they have to move.
See more ideas about parapet architecture details construction drawings. To wall sloped roof no overhang ledger support. Exterior wall parapet rafters prep. Joists are placed on edge spaced at 400 600mm centres supported by external and internal load bearing walls.